Biosecurity and Root Barrier Installation, M58
- Feb 1
- 1 min read
Service category: Commercial Invasive Weed Solutions
Client: GVA
Location: M58
Project value: £5,566
Reported saving: Saving to the network through reduced disruption and cost
Oliver Brown Ltd supported a cable installation project alongside the M58 where Japanese Knotweed was present, using biosecurity controls and root barrier measures to avoid the need for full excavation.
The works allowed the cable route to be installed safely while reducing the risk of spreading Japanese Knotweed material across the site or onto other areas. By using specialist biosecurity procedures and root barrier protection, the team helped keep the project moving without the disruption and cost that would have come with total excavation.
This approach provided a practical, compliant solution for a live infrastructure setting, helping reduce programme disruption and wider network impact.